What
are the client numbers you are using in your current project?
A.
Development
System1 D20-50
Development
System2 D20-20
Quality
System Q20
Preproduction
System K20
Production
System P20
What
is the network u r using?
(or)
How u connect to
Client System?
A.
Virtual
Private Network.
Citrix Network.
Explain
Object Delivery Methodologies?
1.
Function people are designing the functional document.
2. Once the
functional specification is ready then they are placing functional
specification in share folder or particular tool.
3. Once they
place the functional specification share folder then immediately the project
lead or team receiving a mail.
4. As a team
lead once receive the mail then as per the resource availability he is going to
assign to some particular employee.
5. As a
technical consultant once we receive the object TS or TD then as a technical
consultant we need to start the analysis.
6. While
analyzing the object if we found any gaps Issues then we need to maintain all
the gaps in issue log sheet issue log sheet is a template.
7. Once the
analysis is done then we need to communicate with the functional owner for the
above gaps.
8. For getting
the solution for the above gaps we need to raise the request for the FS walk
through.
9. Once all
issues are clarify then as a senior technical consultant we need to design the
technical specification or technical document.
10. Once we
finish the TS design then as a design we need to do the self review and send
for peer review.
11. Once finish
the self and peer reviews then we need to send TS of sign off.
12. Once TS is
sign off then as a TS designing we need to start the development or we are
assigning to some junior consultant.
13. While doing
the coding we need to follow the client naming and coding standards.
14. While doing
the coding we need to apply the optimization techniques and modularization
techniques and Inline comments.
15. Once we
finish the coding as a developer we need to prepare the code review check list.
16. Once you
design the code review check list as a developer you need to do the self review
and send for peer review.
17. As a
developer we need to prepare UTP (Unit Test Plane) and UTR (Unit Test Report).
18. Once you
finish the UTP and UTR design then as a developer you need to do the self
review and sent of peer review.
19. Once the
above all peer reviews are sign-off then as a developer we need to inform to
the team lead with program name and transport request number.
What
are the data types you are using in Abap and what are the default values for
the above data types?
A. Data Type Default Value
Integer 0
Char
Space
Packed decimal 0.00
String Space
Date yyyy.mm.dd
Uzeit hh:mm:ss
Numeric 0