2 Object Delivery Methodologies:

Object Delivery Methodologies:

1. Function people are designing the functional document.
2. Once the functional specification is ready then they are placing functional specification in share folder or particular tool.
3. Once they place the functional specification share folder then immediately the project lead or team receiving a mail.
4. As a team lead once receive the mail then as per the resource availability he is going to assign to some particular employee.
5. As a technical consultant once we receive the object TS or TD then as a technical consultant we need to start the analysis.
6. While analyzing the object if we found any gaps Issues then we need to maintain all the gaps in issue log sheet issue log sheet is a template.
7. Once the analysis is done then we need to communicate with the functional owner for the above gaps.
8. For getting the solution for the above gaps we need to raise the request for the FS walk through.
9. Once all issues are clarify then as a senior technical consultant we need to design the technical specification or technical document.
10. Once we finish the TS design then as a design we need to do the self review and send for peer review.
11. Once finish the self and peer reviews then we need to send TS of sign off.
12. Once TS is sign off then as a TS designing we need to start the development or we are assigning to some junior consultant.
13. While doing the coding we need to follow the client naming and coding standards.
14. While doing the coding we need to apply the optimization techniques and modularization techniques and Inline comments.
15. Once we finish the coding as a developer we need to prepare the code review check list.
16. Once you design the code review check list as a developer you need to do the self review and send for peer review.
17. As a developer we need to prepare UTP (Unit Test Plane) and UTR (Unit Test Report).
18. Once you finish the UTP and UTR design then as a developer you need to do the self review and sent of peer review.
19. Once the above all peer reviews are sign-off then as a developer we need to inform to the team lead with program name and transport request number.
 